top of page

KUCHING

GATEWAY ARCH BRIDGE

COMPLETED 2008

Construction of this 6 LANE, 160M LONG TRIPLE SPAN DECK-STIFFENED ARCH BRIDGE was completed in 2008

Turnkey Contractor was ZECON SDN BHD and we were responsible for  STRUCTURAL ENGINEERING

bottom of page